Business introduction

Greeting

By pursuing agile work methods that are linked to market/customer
expectations, we will achieve dramatic improvements in the added value of
manufacturing and services.

Business Philosophy

We strive to continuously improve the corporate value of our customers through the creation of new value in the field of production systems.

President Message

I started out working at a research institute and started working on production system optimization tools and system simulations.
We have been working on research and development and practical application.
After that, including overseas production management, factory manager and productionAs a general manager, I practiced factory and SC management.
Especially in Toyota’s independent research activities,As a regular member, he promotes independent research activities in Europe as well as in Japan, realizing profitable factories and SCs.
I’ve been Since 2015, we have been working on how to proceed with global SCM/product development work using IT.
I promoted development, and was in charge of planning manufacturing strategy and overseeing global manufacturing in the business division.
Experience in management, control, and on-site management at Japanese and foreign companies, as well as factory management and executionOn June 1, 2022, we opened the Kamigaki Production System Lab in order to make use of our experience of responsibility in society.
We would appreciate it if you could help us improve productivity and revitalize your company / factory.
We look forward to your continued guidance in the future.

Business Introduction

・Trade name Kamigaki’s Production System Lab
・Founding 1st June 2022
・Representation Toshimitsu Kamigaki
・Address Fujimino-shi Saitama, 356, Japan
・Bank Saitama Resona Bank, Limited  Kamifukuoka Branch Ps

Business Introduction

Trade name

Kamigaki’s Production System Lab

Founding

1st June 2022

Representation

Toshimitsu Kamigaki

Address

Fujimino-shi Saitama, 356, Japan

Bank

Sumitomo Mitsui Banking Corp.

Job Career

Apr. 1986

Htachi, Ltd. (former Hitachi Plant Construction Co, Factory planning R&D, Factory Planning participation

Mar. 1990

Bosch Corporation (former Diesel Kiki Co., Ltd.): Production and Logistics systems Design & Improvement

→HVAC development lead time halved/ Factory relocation plan (MLP): Project leader

Jul. 2002

Diesel Systems Div. Production Control Dept./ Production Systems Dept. General Manager

→Delivery lead time/ Inventory reduction Project owner: Production & Logistics in SAP/R3 Implementation

Apr. 2005

Diesel Systems Div. Higashi Matsuvama No. 1 Plant Manager. Start of Toyota Jishuken acties

Jan. 2008

Bosch Production System (BPS) Office General Manager and Toyota Jishuken Promoting member

→26th Toyota Jishuken annual presentation/ 27th Toyota Jishuken seminar Promoting member

2012年5月

Robert Bosch GmbH C/MPS Residence, Chief consultant

→EU Toyota Jishuken promotion/ Intemal Jishuken guidance: Expanded to EU 4 factories

Nov. 2013

Seconded to Bosch Packaging Technology Co., Ltd. Engineering Div. Manager and Funabashi Plant Mager

→Pharmaceutical production equipment introduction lead time reduction project owner

Feb. 2016

DENSO Corp. Information Systems Div./ Production Engineering Div. Project General manager

→Digital SCM/ Product development process development, logistics reform Project advisor

Oct. 2018

Thermal System Manufacturing Planning Div. Project General manager

→Practical guidance for creating ideal and target Plant/ SC, Strategy & Global manufacturing control

Nov. 2019

Seconded to *Denso Sankyo Co., Ltd (former Sankyo Radiator Co., Ltd.) General Manager

Apr. 2020

Manufacturing Planning Dept. Executive Officer, Jul. 2021 Environmental Management Executive Officer

Jan. 2022

Retired to *Denso Sankyo Co., Ltd (former Sankyo Radiator Co., Ltd.)

Jun. 2022

Opened Kamigaki’s Production System Lab. President

Mar. 2023

Oriental Engineering Co. Ltd. Management innovation office Executive manager

Feb. 2024

Nihon University Part-time lecturer / In charge of special courses on industrial engineering

Patents, Thesis, External presentations, Award, Qualifications

Patents

Disk dryer(1990-28084)
Worker discretion utilization schedule planning method/ device (1996-265449)

Production System Design Equipment (2001-2222311), etc. Total 6

Thesis

Application of Simulation Evaluation Technology in Automatic Processing Line, Journal of Japan Institute of
Equipment Management, Vol.5, No.4 (1994)

Assemblability evaluation procedure for promoting easy-to-manufacture design, IE Review, Vol.38,
No.4 (Oct. 1997), etc. Total 10

External Presentations

Introduction of Factory Planning Technique FAPLASS, System Simulation Study Group (Jun. 1989)

Efficiency improvement case of production system using system evaluation technology,
Total Logistics Optimization Forum (Nov. 1995), etc.
Total 8

Awards

IE Excellent Paper Award, Japan Management Association (1998)

OR Implementation Award/Japan OR Society (1999), etc.
Total 4

Press release

What is the evaluation method in the production system design procedure 2/Management system (Jan. 1993)

Scheduling software for efficient use of production capacity / Nikkei Mechanical (1995.2), etc. Total 5

Main Acquisition Qualification

Development Engineer, TD-500 (December 1995)

Work Design Class, Management Sciences in Graduate School of Waseda University (November 1987)

Goldratt Master Executive Certification for TOC Holistic Management, Goldratt school(Dec. 2017), etc